Rabu, 7 Mac 2012

Second Meeting


In my second meeting with supervisor, I have being told that there are lots of improvement must be done. My supervisor has review the reports deeply and come with the new technic of report. This is because the example report that given by University is not enough to be referred. More over the example report have done a research which is opposite with mine that create a project.

Below is the point that I have to redo;

1.     Introduction

*       must include the scope of project, summary chapter and aspect outcome.

2.     The Methodology.
*       must include the block diagram and flowchart.

Week 4


Submit Proposal

In week 4 (UniKL-BMI calender), I have submitted project proposal to my supervisor Mr.Suhaimi Bahisham B Jusoh@Yusoff .  My report has being done based on guideline of finale year project report given by University. This proposal will in check by the supervisor, so that we can complete if there is lack of content and make improvements. 



Research 3


From my research, Micro hydro is frequently accomplished with a pelton wheel for high head, low flow water supply. The installation is often just a small dammed pool, at the top of a waterfall, with several hundred feet of pipe leading to small generator housing. The system detail can be seen as the video below:



The Hydro is important to make my system more environmental friendly. The important thing that I have plan after this is to make the system fully automated by combine all the part of my research.


Reserch 2


Why chose to use alternative route?

The alternative route is very important because it not affects the nature of the river and not makes any trouble compared to dope the river. In some place when flood happen there always use of the flood barrier by using sand bag. This is not efficient because it difficult to make and take a long time. Compared to alternative route, it is created for a once and reedy for use while needed.

Below is the example of sand bag:

To divert water to an alternative route, this system will use water pump. This is because it is simple to install and use very simple concept which is suction the water and remove to the desired place.

Examples of concepts that will be used as the video below:

                                                          




Research 1

Nowadays there are a lot of systems that have being created in this world to inform the people about the possibility of flood.

Below is the example system:


The system above is very good because it give the residential area information about the possibility flooding. The problem with this system is, it just give information and not control the situation. 
From this technology, I get the idea that if we can monitor the water properly and timely we can overcome the destruction. My idea is to create a system that can help human to control the flooding and take the advantages of the flow water to generate an electricity.

Introduction


Name: Ahmad Hasif Bin Hashim

University: Universiti Kuala Lumpur - British Malaysian Institute 

Supervisor: Suhaimi Bahisham B Jusoh@Yusoff

Project Title: Hydro Flood Control System

Descriptions: Hydro Flood Control System is the system that uses to detect the water level of the river and bring it to alternative route if it reaches the maximum limit. The water that flow at alternative route will use to generate an electricity by using turbine.

In this project, my focus is to monitor the system of flood control and make the process can be fully automated.